API 570 Question

1.For 8” ND Sch 40 and   8” ND Sch 80 pipes,

    1. OD for both pipes will be same
    2. IDs and ODs for both pipes will be different
    3. Average pipe diameters for both will be same
    4. ID for both pipes will be same

 

2.Hot tapping is best described by statement:

    1. It is technique of heating the pipe to specified temperature and gently tapping with 1 lb. rounded hammer to detect thinning of pipe wall
    2. It is technique of providing a tapping connection while pipe system is in operation
    3. It is technique of fixing a water tap on hot water lines for use during winter
    4. It is act of using the tap and die for threading the pipe when the pipe is hot

 

3.Which of the following defines the term hold point?

    1. The point at which a pipe hanger is attached to a pipe.
    2. A point at which a U-clamp is fixed on the pipe.
    3. A point at pipe beyond which work may not proceed until inspections have been performed and documented
    4. A trunnion, or sliding shoe used for piping support systems

 

4.Which of the following statements is true?

    1. Flange rating indicates flange diameter.
    2. Other factors remaining same, ERW pipes can withstand higher pressure than seamless pipes.
    3. Deadlegs means pipes with broken supports.
    4. API 570 is applicable for metallic pipes only.

 

5.Post weld heat treatment is carried out

    1. To increase Hardness
    2. To increase Tensile strength
    3. To release locked-up stresses in the weld
    4. None of above.

 

6.What section of the ASME boiler and pressure vessel code is the basic document for welding procedure qualification?

    1. Section III
    2. Section VIII
    3. Section IX
    4. ASME Section II C

 

7.What can be caused to ferrous metals by the low operating temperatures?

    1. Increase of ductility
    2. Loss of ductility and toughness
    3. Increase in plasticity or deformation
    4. Decrease in yield strength

 

8.API 570 is intended to apply to:

    1. New piping in the chemical Industry
    2. Piping that has been placed in service
    3. New piping in the Petroleum Refinery
    4. New piping in the Paper Industry

 

9.If a welder is to be qualified in all positions he must pass test in which positions?

    1. 1G, 2G, 3G and 4G
    2. 5G and 4G
    3. 6G
    4. 5G and 4G

 

10.ASTM A 106 Gr B pipes belong to which type?

    1. Seamless only
    2. ERW only
    3. Seamless or ERW depending on type of Grade
    4. None of above

 